Start Date on P95600 not working as expected

sheeba

Reputable Poster
We are on JDE 9.0 TR 8.98

Start Dates on the P95600 doesnot seem to work as expected

We have 2 templates

1 template with a date 2/1/2016 thru 8/1/2018 with logo#1

2nd template start date = 8/2/2018 with logo#2

When we run our BIP jde report - it still picks up the old template (with logo#1)

Not sure why it doesn't consider the dates and process with the 2nd template.

Has anyone seen this issue?
 
Looks like when I enter a end date on template 2 - it works as needed. However, when I leave the end date as blank - it picks up template 1 - which is a little weird thou.

Has anyone else experienced the same
 
Back
Top