Setting F4108.MMEJ in a rework Work Order with a parts list

johndanter

johndanter

Legendary Poster
Hi Folks,

I am trying to override the lot expiry date to a value I pass in

We use DC Link ND3N114 (well a slight copy of it) and we set the lot expiration date by passing it in via jdExpiredDate_EXPR.
This works fine for normal WOs

If we try the same thing with a WR rework WO I am noticing that it is ignoring what I pass in and setting the MMEJ to be plus 999 days.

I am noticing in the logs that BSFN B4100540 F4108 Get Lot Expiration Date is the place where the new date of plus 999 days first appears in my log.

Is there anyway I can stop this occurring and getting the system to honour the date I pass in?

Thanks

John
 
Last edited: