WO with outsourcing order

hsiao_te_wang

Well Known Member
Hi Lists,
Does anyone have suggestions how to link the WO with its related purchasing order ( items like *OP1) ? The SO will be recorded in WO header if WO create by SO but how about if outsourcing PO created by WO ?
I am asking to prevent completing the WO before the outsourcing PO received and issued against the WO.
Thanks if any suggestions.
Regards,
John Hsiao, ERP8 Update1, SP21
 
John, To get the OP/ WO link, check the processing options on R31410 under the "Routing" tab, doc type, line type, status,and subledger field= 1. Then on the items routing check that the OP Y/N flag is set to Y, the vendor number is populated, and the cost type is D1 (for the first Outside Op ,if you use multiple Outside processing steps per work order first = D1 2nd=D2,etc.). Enter the SO ,creating the WO, run R31410 to create OP. Look in the Related Order Num field of OP = WO #
 
Hi John,

You've stated,
"I am asking to prevent completing the WO before the outsourcing PO received and issued against the WO."

If this is your problem, set the processing options to 1 of P31123 Edit tab. This should solve your problem.
 
John,

I agree with the previous two posts, in summary: the Subcon PO is linked to the Routing Operation Sequence not the WO Header, therefore, if you check the PO it refers to the WO and OP Seq. Likewise, if you check the WO Route it refers to the PO at the Subcon Op. This is where the link is IF you are using R31410 to create the PO. If you are not then you can manually maintain a link to the PO through P3112 but I don't think the opposite link can be put into P4310 - correct me if I am wrong but I think this requires a minor mod.

Once this link is established then receiving the PO through P4312 will push the quantity through the Operation in the WO Route. When this is done you can use Superbackflush P31123 or Time Entry P311221 with the "Quantity at Operation verification" processing Option switched on - as per the second reply to your question.

This won't change the Work Order Status so you cannot prevent a WO Completion. However, you couldn't physically complete the WO if the items were not back from Subcon. I have seen a Business where the goods return straight onto the shop from the Vendor without going through P4312 - the GI staff catch up with the receipt days later. This has lead to problems where the WO is completed and then pushed into Accounting prematurely.

This is a procedural issue. Many companies tend to do some basic checking before allowing WO's to be closed for Accounting. Many write simple reports, or even sophisticated UBE's, that will, at the least, show anything not booked, or, at most, check and then change the WO Status based upon hard-coded criteria.
 
Thanks for the detailed answers, guys!
Really helped me through this predicament.