Cost Simulation - Routings

mchad07

Member
The cost simulation R5830812 is not including the routed hours on a few parts. Never seen this before. Cost roll is scheduled in two days! Anyone know what is going on here?
 
Few things to check:

1. Ensure batch quantity on routers matches with batch quantity on Bills
2. Check Effective thru dates.
3. Ensure CPYP & OPYP have non-zero ( usually 100) on routing operations.

Hope it helps!
 
Are these parts defined as Manufactured parts (stocking type "M")?
Besides checking the batch quantity on the routers, check the routing type (usually "M").
Is your R5830812 a copy of R30812? If so, is there any custom code in the copy that could be causing this?

Good luck!
 
Thank you for the responses. How do I check the routing type in the routers?

Yes, it is custom code from implementation. We do not currently have a developer that can tell us what is custom about it. Never had an issue with the custom code since 2007 however.
 