Is it possible to define Fixed Lead time for Co\By Products ?

SSK

Member
Is it possible to define Fixed Lead time for Co\\By Products ?

How can we set the fixed level lead time for Co/By product of a main item. We set the Fixed /Variable lead time as Fixed and cleared the "MFG Leadtime Quantity" even then while running the job R30822A, system is calculating the lead time based on main product.

How can I fix this as Fixed LEad time?
 
Back
Top