R91300B impacts future scheduled jobs

cncjay

Well Known Member
When running the scheduler Purge ube R81300B - we are seeing anomalies where the future scheduled weekly jobs are dropping off - anyone see this type of oddity ?

Thanks,
CNCJay
Release E1 9.0 Tools 8.98.3.1
 
Filter out the active jobs Jay.
PS Use Data Selection.

Attached is my take on it, based on an Oracle How To document (sorry, I lost it).
The key here is to retrieve->format->include in Proc Options the UTC (in minutes).
 

Attachments

  • 165410-R5691300C.zip
    6.4 KB · Views: 164
Adrian - Thank you for the tip, and teh attachments.

Regards,
CNCJay
 
Back
Top