Member
When we run MPS, system is not considering the line capacity / WorkCenter capacity. System is giving messages for more Work Orders with same line even though it is over-capacity. We are using E1 8.12 with process manufacturing.
Could any one please give some light on this issue. Thanks in advance.

Regards,
 
MPS does not consider line capacity. The normal flow is:
1. Run MPS,
2. Run Rough Cut Capacity
Balance your load by moving some MPS work orders around.
3. Re-run RCCP to check load balance.
4. Run MRP.
 