Actual Cost

radams

Member
John,

While at the Focus on Education 2001 training classes before FOCUS, one of the
instructors in my Manufacturing Xe class said that actual costing in Xe can be
used only on parts with a single level bill of materials. Actual costing on
parts with more than a single level bill of materials will be addressed in the
next OW release.

So unless your product utilizes single level bills of materials, I'm not sure
you can proceed any further.

Robert

---------------------- Forwarded by Robert Adams/CASCADE on 06/25/2001 11:30 AM
---------------------------


hsiao_te_wang <[email protected]> on 06/22/2001 07:25:28 AM
 
Back
Top