AW: Move from Lot Cost to Branch Cost

roland_rueegg15

Active Member
use batch R41815. Note that the cost are retrieved from the primary
location.

Cheers
Roland.

-----Ursprüngliche Nachricht-----
Von: [email protected] [mailto:eek:[email protected]]Im
Auftrag von [email protected]
Gesendet: Dienstag, 19. Juni 2001 18:55
An: [email protected]
Betreff: Move from Lot Cost to Branch Cost


Hey all,

Have a client that is at a Cost level 3 (Branch/location/lot) and in their
legacy JDE system kept cost at the lot 06 in the F4105. I have convinced
them to go to a standard cost system and maintain cost at the Branch level
(cost level 2).

Has anyone any experience with movement from a lot to standard cost system
as well as the change of the cost level. I am looking for a systematic way
of doing this without having to manually touch each item record in the F4105

Thanks

William H.
 