bub
Member
Hi List,
I need your help about run sequence of UBEs.
I explain my problem :
I've a BSFN (N4200310) who call UBE R42750.
At the end of this BSFN, I've add a call for a custom BSFN who do some updates and finish with a call of R42565.
This 2 UBE are running in the same Queue who's monothread.
Chronologicly, the R42750 is call before the R42565. If you look in WSJ, the Job Number of R42565 is greather than the Job Number of R42750.
But, the R42565 run BEFORE the R42750.
If I mapped this 2 UBE on Local, the UBEs run in the good sequence. But, if the UBE are mapped on server, the sequence is KO : R42565 run BEFORE R42750.
Plat-form : PeopleSoft E8.10 (Unix)
I cannot understand why and how this situation is possible ...???... And you ???
Thanks.
Regards
I need your help about run sequence of UBEs.
I explain my problem :
I've a BSFN (N4200310) who call UBE R42750.
At the end of this BSFN, I've add a call for a custom BSFN who do some updates and finish with a call of R42565.
This 2 UBE are running in the same Queue who's monothread.
Chronologicly, the R42750 is call before the R42565. If you look in WSJ, the Job Number of R42565 is greather than the Job Number of R42750.
But, the R42565 run BEFORE the R42750.
If I mapped this 2 UBE on Local, the UBEs run in the good sequence. But, if the UBE are mapped on server, the sequence is KO : R42565 run BEFORE R42750.
Plat-form : PeopleSoft E8.10 (Unix)
I cannot understand why and how this situation is possible ...???... And you ???
Thanks.
Regards