O.W. Scheduler Problems P91300

Kansas

Member
I have added a job that is scheduled to run every day @ 3pm, I have the PO to create 5 entries with no expiration date. After the 5 entries have processed the sheduler does not add the next 5 entries. Is this correct or should it automatically add the next 5 entries.
 
It's because you leave a field blank.
from my memory, it's "Occurs every xx weeks" where you should put "1".
 
Hi Randy.

I think Charles is correct about the blank field being your issue. I have done this one myself. But keep an eye on the jobs periodically even if this fixes your issue.

I have a mix of scheduled jobs on my systems, some with no expiration as you are doing and some with expirations. This is to address an unpredictable issue I have encountered where jobs with no expiration just stop scheduling. I can update the job without making a change and it will create the next 5 jobs and stop again. Or things will return to normal for that job. Very odd and very infrequent.

Good luck!
 
Back
Top