gerd_renz3
VIP Member
Hi List,
I have a new ERP8, SP22, AS400 install and have found a new feature, previously unknown to me:
Whenever an application is processing on a WS, I cannot open any other application. Instead I get a message box saying:
"A new application cannot be started while other applications are processing".
By talking to fellow CNCs I have learned that this behavior comes from SP22, it´s not a bug, it´s supposed to be like this. It´s supposed to happen with Xe as well.
To give an example: on the DS I am running P96470, actually R98700 spec merge for Update1. This takes 3 hours on my DS. When I try, at the same time, to open any other app, like OCM, User Profile, whatever, I get the above message.
Is there any way to switch this off? How do others cope with this new feature? I would guess that power users (like me) won´t like it.
Thanks, Gerd
ERP8, SP22, Update1, AS400, few Fat clients
I have a new ERP8, SP22, AS400 install and have found a new feature, previously unknown to me:
Whenever an application is processing on a WS, I cannot open any other application. Instead I get a message box saying:
"A new application cannot be started while other applications are processing".
By talking to fellow CNCs I have learned that this behavior comes from SP22, it´s not a bug, it´s supposed to be like this. It´s supposed to happen with Xe as well.
To give an example: on the DS I am running P96470, actually R98700 spec merge for Update1. This takes 3 hours on my DS. When I try, at the same time, to open any other app, like OCM, User Profile, whatever, I get the above message.
Is there any way to switch this off? How do others cope with this new feature? I would guess that power users (like me) won´t like it.
Thanks, Gerd
ERP8, SP22, Update1, AS400, few Fat clients