msouterblight1
VIP Member
To all,
I was wondering if anyone had a list of the jobs that must run single threaded in ERP 8.0. I have the list for XE, but I was wondering if there was an update to it for ERP 8.0, or if it was the same..
Thanks,
I was wondering if anyone had a list of the jobs that must run single threaded in ERP 8.0. I have the list for XE, but I was wondering if there was an update to it for ERP 8.0, or if it was the same..
Thanks,