Scheduler

bestringer

Member
Looking for any insight on issues with scheduler. Everytime I try to start the Scheduler Server I get a very generic error: "Failed to notify the Scheduler Server of the control record change." I have read all of the doc JDE has, but have been unable to resolve.

Xe SP20 L1 AS400
 
We had the same problem when I set up our server.

In my case, I had our schedule server set up to be our logic server (<AS400>-Logic). When I changed to the correct server <AS400>, this solved our problem.
 
Back
Top