R30812 Cost Simulation

mchad07

Member
We have identified an issue with the cost simulation program R30812. This has stumped our JDE consultant and Oracle! A manufactured item has 38 hours of routed time. All workcenters have frozen labor and overhead rates greater than $20, However, when the R30812 cost simulation program is ran, the routed costs only calculate $7 in direct labor and $16 in overhead. Not even Oracle can explain this one.
 

jhsiao520123

Active Member
Couple things can start to look:
1. If this is multilevel of BoM, refresh your low level code and run again !
2. Review your routings on TBC or UOM to see if any findings !

John Hsiao,
 