R30812 - Cost Simulation

coljp

Well Known Member
They want to know the mathematical formula by which the system calculates the cost elements A1, B1 and Xs of an item in the simulation process cost R30812, because it now presents an inconsistency in an father item which is composed of 3 items on its bill of materials


The bill of materials has batch number and percentage of costs allocated as follows:

Father Item COOAGRAGSA13000055

BOM:

item Batch Quantity Percent Cost

COOTCL05AGSA08000055 0.017 TN 0.20

COOTCL05AGSA12000055 0.017 TN 0.20

COOTCL05AGSA05000055 0.019 TN 0.20
 
Back
Top