Vasu_JDE
Well Known Member
Has anyone written an UBE to build load in JDE. We have a simple process of load build and would like an UBE to build load on a schedule job.
I can use the same business functions used in P4960 but would like to know if there is anyone who have found another way to do this.
Thanks
Regards
I can use the same business functions used in P4960 but would like to know if there is anyone who have found another way to do this.
Thanks
Regards