I have a situation where we are designing products and want to prevent manufacturing from entering and processing WO's for those items until they pass through the Pre Production Approval Process (PPAP). Is there a way in vanilla JDE to prevent this from happening other than having a separate B/P (and all the associated maintenance) for engineering? The ECO process does not appear to do what we want as once the items are entered, they are "live".
If this configuration is not available in JDE, is there any software package compatible with JDE that supports PPAP?
Thanks,
Jeff
EOne 9.10