bill of material

  1. E9.1 Order Return and Re-Invoice Process - SAME DAY RMA ?? - NEED *CLEVER* Solution!

    Return and Re-Bill Process IMPROVE current process -- many steps dependent on multiple users and small window of time. Using Credit From History today -- but the order has to be already posted to GL. EXAMPLE: We have instances of a truck picking up a load at which point we do final ship...
  2. kpankaj1987

    Custom application is not working in Production

    Hi All, I am facing this problem where there is a custom application in BOM which is working fine in Development and Test environment. The same application is failing to populate the custom table as per the requirement. ( for range of Business unites it is not populating) what could be the...
  3. Is there a way to setup a BOM item as having both variable and fixed quantity?

    We are a machine shop facility that recently migrated to JDE 9.0. We have raw material on a BOM that requires fixed and variable quantity. For example, parent item, PARENT-abc has a manufacturing quantity of 5 each. The raw material requirement item, RAW-BARSTOCK needs 2 inches of fixed...
  4. Raw material on BOM needs both fixed and variable quantity

    We are a machine shop facility that recently migrated to JDE 9.0. We have raw material on a BOM that requires fixed and variable quantity. For example, parent item, PARENT-abc has a manufacturing quantity of 5 each. The raw material requirement item, RAW-BARSTOCK needs 2 inches of fixed...