How can I put level lead tme for a Manufature item

SSK

Member
I have manuafatured item A and components B,C and D. All my components are having Variable lead time and I have put my parent A as Fixed lead time and enter a value. but the job R30822A - Leadtime Rollup is over riding the Fixed Lead level perent's value.

How can I prevent the level lead time date clearing from the batch.

Do I need to set all the component aslo Fixed lead time ?
 
Back
Top