ice_cube210
VIP Member
Hi List,
This is my config
Apps 9.0 , Tools 9.2.0.3
DB - SQL 2014 std on Win 2012 R2
ES - Win 2012 R2 Standard
Visual Studio 2013
Fully Virtual Environment on VMWare (don't have the specifics of the version and hardware platform)
When building a full package , client full package finishes fine in 2-3 hours. Server Package seems to take ever , specifically the GenNER process. This process alone takes more than 10 hours . CPU utilization is extremely low on Enterprise Server and the DB server during this time. So that does not appear to be a bottle neck . When comparing with a system where this does work fine , we can see a reasonable amount of CPU and Network activity (35-40%)
When looking at the GenNER.exe in task manager on the Enterprise Server it seems to be waiting on Network I/O.
I have a ticket open with Oracle , and they have not been able to reproduce the issue , so they don't believe it to be a code or tools issue. They think its a network or IO issue
I have also not experienced this issue at other customer sites with similar configs (Virtual , Windows / SQL , same tools , the only difference being it was Apps 9.1)
The Infrastructure team says that they don't see anything on their end. But we are going to have to really dig deeper and do some real time tracing.
But before we go down that path , I wanted to check if anyone on here has experienced anything similar ?
Thanks in Advance !!
This is my config
Apps 9.0 , Tools 9.2.0.3
DB - SQL 2014 std on Win 2012 R2
ES - Win 2012 R2 Standard
Visual Studio 2013
Fully Virtual Environment on VMWare (don't have the specifics of the version and hardware platform)
When building a full package , client full package finishes fine in 2-3 hours. Server Package seems to take ever , specifically the GenNER process. This process alone takes more than 10 hours . CPU utilization is extremely low on Enterprise Server and the DB server during this time. So that does not appear to be a bottle neck . When comparing with a system where this does work fine , we can see a reasonable amount of CPU and Network activity (35-40%)
When looking at the GenNER.exe in task manager on the Enterprise Server it seems to be waiting on Network I/O.
I have a ticket open with Oracle , and they have not been able to reproduce the issue , so they don't believe it to be a code or tools issue. They think its a network or IO issue
I have also not experienced this issue at other customer sites with similar configs (Virtual , Windows / SQL , same tools , the only difference being it was Apps 9.1)
The Infrastructure team says that they don't see anything on their end. But we are going to have to really dig deeper and do some real time tracing.
But before we go down that path , I wanted to check if anyone on here has experienced anything similar ?
Thanks in Advance !!