Iamdolby
Member
Hello there !
Can I use product costing method 01 (last in) for manufacturing item ?
or can I put in this way, is it manufacturing item only can use Actual Cost (weighted average 09 or actual cost 02) ? or Standard Cost (07) ?
I have a question if our products are missing some components but we do have calculated reference cost from shopfloor.
Can I use this reference cost for WO completion and capture into item ledger and general ledger ?
Thank you very much,
Gary
Can I use product costing method 01 (last in) for manufacturing item ?
or can I put in this way, is it manufacturing item only can use Actual Cost (weighted average 09 or actual cost 02) ? or Standard Cost (07) ?
I have a question if our products are missing some components but we do have calculated reference cost from shopfloor.
Can I use this reference cost for WO completion and capture into item ledger and general ledger ?
Thank you very much,
Gary