Jeff_MontAssoc
Active Member
When using the Cycle Count process, we are configured to set the Next Count Date (F41021.NCDJ) based on the Cycle Count Code (F4102.CYCL). The dates all calculate correctly. The issue we have is that the calculation does not take workdays vs. non-workdays into account. Is there a way to configure the system to take the shop calendar into account when calculating the Next Count Date? Even better would be to specify which shop calendar to use, but we don't want to be too greedy.
EOne 9.1
EOne 9.1