johndanter
Legendary Poster
Hi List,
I asked this on the functional area but no joy.
Does anyone here use these 2 modules for rapid on boarding of item config in E1?
Is it any good? Is it customisable enough for you?
Or should I design something else myself.
Problem is I work for a supply chain company and the end users complain about how long it takes to introduce a new ITM, BOM, UOM etc to the E1 system. A quick google and a read of E1 docs points me down the 41F 41V route.
Thanks
John
I asked this on the functional area but no joy.
Does anyone here use these 2 modules for rapid on boarding of item config in E1?
Is it any good? Is it customisable enough for you?
Or should I design something else myself.
Problem is I work for a supply chain company and the end users complain about how long it takes to introduce a new ITM, BOM, UOM etc to the E1 system. A quick google and a read of E1 docs points me down the 41F 41V route.
Thanks
John